{"product_id":"zipwall-2-x-foam-rails-1-5m-long","title":"ZipWall 2 x Foam Rails (1.2m Long) FR2-Pack (ZTS2)","description":"\u003ch2\u003eZipWall 2 x Foam Rails (1.2m Long) FR2-Pack (ZTS2)\u003c\/h2\u003e\n\u003cp\u003eZipWall Barrier System products are designed to work together. You can start with a small barrier system and add to it over time. We've packaged our products in easy-to-combine kits. To see a picture of each product and its contents, just mouse over the product name.\u003c\/p\u003e\n\u003cp\u003ePackage include:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e2 five foot Foam Rail cross bars\u003c\/li\u003e\n\u003cli\u003e2 T-clips\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eAn ZWP or ZSTpole is required for each Foam Rail's cross bar. These poles are not included in the FR2-Pack.\u003c\/p\u003e\n\u003cp\u003eNo pole is needed if using the Rails with the Side Clamp's wall mount. These clamps are also not included with the FR2\u003cspan\u003e-Pack\u003c\/span\u003e.\u003c\/p\u003e\n\u003cp\u003eThe T-Clip is used to mount the poles anywhere along the Rail. Each FR2\u003cspan\u003e-Pack\u003c\/span\u003e comes with 2 T-Clips.\u003c\/p\u003e\n\u003cp\u003eThe Foam Rail's cross bars push the plastic or barrier material against the ceiling but do not hold the material securely in place. You must set up your barrier using the ZipWall poles placed 8 to 10 feet apart. This makes an incredibly secure and tightly sealed barrier.\u003c\/p\u003e\n\u003cp\u003eThese two foam rails can also be used in conjunction with the \u003cspan style=\"text-decoration: underline;\"\u003e\u003cspan style=\"color: #0000ff; text-decoration: underline;\"\u003e\u003ca rel=\"noopener noreferrer\" style=\"color: #0000ff; text-decoration: underline;\" href=\"https:\/\/www.paintaccess.com.au\/products\/zip-wall-tight-seal-extending-adaptor-zea1\" target=\"_blank\"\u003eTight-Seal Extending Adaptor\u003c\/a\u003e\u003c\/span\u003e\u003c\/span\u003e to make one, very long tight seal (up to 2.5m)\u003c\/p\u003e\n\u003cp\u003eImagine how it would feel to have a contractor run duct tape across your perfect ceiling, or a drive in a row of staples or screws just to create a tight seal with plastic sheeting? With the Foam Rail cross bars you'll never have to find out. The Foam Rail cross bar works with the \u003cspan\u003eZW\u003c\/span\u003e\u003cspan\u003eP or \u003c\/span\u003e\u003cspan\u003eZST\u003c\/span\u003epoles to create a virtually airtight seal by pushing its foam edge against the plastic and ceiling. Each rail is 5 feet long and is made of strong, lightweight aluminum. The spring loaded pole holds it in place and it takes just seconds to install with out damaging a thing.\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e[lightbox url=\"https:\/\/www.youtube.com\/embed\/NPKhIfVeSNE?autoplay=1\" text=\"ZipWall Products Overview\" type=\"iframe\" class=\"btn btn-info\"] \u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e\u003ciframe src=\"https:\/\/www.youtube.com\/embed\/B8vYRhLfhyc\" height=\"500\" width=\"100%\" allowfullscreen=\"\" frameborder=\"0\"\u003e\u003c\/iframe\u003e\u003c\/span\u003e\u003c\/p\u003e","brand":"ZipWall","offers":[{"title":"Default","offer_id":41592653512807,"sku":"ZTS2","price":110.0,"currency_code":"AUD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0611\/2470\/6407\/files\/zip-wall-FoamRail-Tapeless-Seal-Cross-Bars2.jpg?v=1754603493","url":"https:\/\/www.paintaccess.com\/products\/zipwall-2-x-foam-rails-1-5m-long","provider":"Paint Access","version":"1.0","type":"link"}